The energy transition brings legal questions for entrepreneurs, farmers, property owners and project developers. What permission is required for a solar park, energy hub, wind turbine, battery or installation for heat and cold storage (WKO)? What does grid congestion mean for a project? And what obligations apply for energy savings? The lawyers of Schenkeveld Advocaten help you assess the public and contractual consequences in context.

Energy law concerns the rules and agreements regarding the generation, storage, saving, delivery and infrastructure of energy. It includes the Environmental Code, permits, grid connections, subsidy schemes, land use and agreements.

Legal advice on energy projects 

An energy project requires more than just a technical solution. The location, the environmental plan, any permit and reporting requirements, available grid capacity, and agreements with relevant parties influence what is possible and when the project can be carried out. We advise on the legal issues involved and assist clients in negotiations with governments and other stakeholders, and where necessary in appeal, disciplinary, or contractual procedures.

When dealing with energy-related issues, we work together with our specialists in agricultural law, real estate law, corporate law and public law where necessary.

Simone Smit, lawyer in public law, real estate law, agricultural law, energy law, quote Schenkeveld advocaten

Permits for renewable energy and energy storage

Do you want to build a solar park, energy hub, wind turbine, battery, charging facility or WKO installation? Then the regulations that apply at the location and whether an environmental permit, notification or other approval is required must be assessed per project. Nature, the environment, safety, landscape integration and provincial or municipal regulations also play a role. Not every project follows the same procedure.

For projects that do not fit within the environmental plan, a change to the environmental plan or a permit for an off-plan environmental plan activity may be considered. In granting that permit, factors such as the balanced allocation of functions to locations play a role. Timely assessment of the spatial and legal prerequisites helps to make bottlenecks in planning visible.

Network congestion and transport capacity

Limited capacity on the electricity grid can slow down the connection or use of transport capacity. This can have consequences for business expansion, electrification, housing development, industrial areas, and new energy projects. A granted environmental permit in itself does not mean that a grid connection or sufficient transport capacity is available. This can have consequences for the feasibility of your project and the permit.

We assess the legal position of the parties involved, the existing agreements with the network operator, and the consequences of delays for permits, contracts, and project planning. Possible technical or contractual alternatives, such as a different phasing or flexibility in energy consumption, always require an assessment of the specific situation.

Energy savings: what obligations apply to your company?

For energy savings, not only the Environmental Activities Decision (Bal) is relevant. For building-related measures, the Building Works Environmental Decision (Bbl) also applies. The Bal contains the rules for environmentally harmful activities. The Bbl includes, among other things, rules for measures related to the use functions of buildings. The obligation, insofar as the regulation applies, does not exclusively relate to energy savings: certain measures for renewable energy and the replacement of an energy carrier may also fall under this category. According to the relevant provisions, the payback period is not to exceed five years (Bal, Article 5.15; Bbl, Article 3.84).

An important starting point is the annual energy consumption. The relevant provisions provide for an exception when the consumption is less than 50,000 kWh of electricity and less than 25,000 m³ of natural gas equivalent. Furthermore, whether the obligation actually applies depends on the activity or use function and the other application conditions and exceptions (Bal, Article 5.15; Bbl, Article 3.84).

Those who fall under the applicable regulations must also provide data on the measures taken. Furthermore, certain large consumers are subject to an obligation to report. The reporting obligations are regulated in the Bal and the Bbl; the obligation to report the energy consumption of environmentally harmful activities is set out in the Bal (Bal, Articles 5.15a and 5.15b; Bbl, Article 3.84a). In the assessment, the approved lists of measures and the specific circumstances of the company or building may be relevant.

Monitoring, enforcement and tailor-made solutions

If a company fails to comply with an applicable energy saving or reporting obligation, the competent authority may take enforcement action. The appropriate and possible measure depends on the violation and the applicable regulations. A penalty under threat of fines may be involved in this case. The question of whether customization is possible also requires an assessment of the situation.

Have you received a notice of inspection, an enforcement intention or an enforcement decision? Then we assess which obligation has been breached by the competent authority, whether that obligation applies in your situation and which response or procedure is appropriate.

Energy projects on agricultural land

With a solar park, energy hub, wind turbine, battery or other energy supply on agricultural land, public and private law issues come together. These include the environmental plan, provincial regulations, nature and landscape interests, the grid connection and the existing agricultural use. In addition, the landowner and the initiator must make agreements regarding access, construction, operation, maintenance, liability and the end of the project.

Depending on the chosen structure, rent, ground lease or a lien may play a role. We help assess and document these agreements and handle the procedures for the necessary decisions.

Climate, water and soil in the physical living environment

The energy transition is not separate from other choices for the physical living environment. Plans for energy generation or business expansion are intertwined with interests in the areas of nature, water, soil, and spatial quality. Environmental visions, programs, the environmental plan, and provincial regulations can influence the location and feasibility of a project. We map out the relevant decisions and interests and advise on the legal options.

What can our lawyers do for you?

We can assist you with, among other things:

  • the assessment of permits, notifications and other approvals for energy projects;
  • issues surrounding network congestion, connectivity, transport capacity and existing agreements;
  • the energy saving obligation, information obligation, research obligation and enforcement;
  • the assessment of the conditions of applicable subsidy schemes and decisions regarding them;
  • agreements on land use, real estate, operation, energy supply and WKO;
  • participation and consultation with residents and authorities;
  • Objections, appeals and contractual disputes.

Would you like to know which rules or agreements are relevant to your situation? Contact our lawyers.