On July 2 last year, the Department issued two rulings regarding the withdrawal of nature permits. Both rulings concern requests for (partial) withdrawal of nature permits under the Nature Conservation Act (Wnb), due to the imminent deterioration of Natura 2000 areas due to nitrogen deposition. These involve a barn in North Brabant and a goat farm in Gelderland.
1. Evaluation framework
The requests were submitted before the entry into force of the Environmental Act and the Supplementary Act on Environmental Nature. As a result, the old law (Wnb) applies in these procedures.
Article 5.4, second paragraph of the Wnb requires the withdrawal or modification of a nature permit if that is necessary to implement Article 6, second paragraph, of the Habitat Directive. Article 6, second paragraph of the Habitat Directive requires the taking of appropriate measures to prevent the deterioration of Natura 2000 areas.
2. Evaluation space
The Department confirms that the GS board has discretion in choosing the appropriate measures necessary to prevent deterioration and disturbances with significant consequences for natural values. The board will – if such circumstances arise – have to decide whether to use the revocation or a modification of the nature permit as an appropriate measure, or that other appropriate measures (will) be taken. If revocation or modification of the nature permit is the only appropriate measure to prevent the impending deterioration of the natural values concerned, the board must revoke or modify the nature permit.
3. Destruction by the Department
In the Brabant case, the decision to refuse (partial) revocation of the nature permit is annulled because the GS council did not make sufficiently clear which measures will be implemented or taken to achieve the necessary reduction in nitrogen deposition within a foreseeable period of time.
Simply referring to national or provincial programs, without providing specific regional evidence of the impact on the relevant Natura 2000 area, is insufficient.
4. Research and justification
The GS board will have to substantiate:
· What reduction in nitrogen deposition is necessary for the relevant Natura 2000 area;
· Within what timeframe can that reduction be achieved, and;
· What measures contribute to this?
If it cannot be demonstrated that other appropriate measures will lead to that necessary reduction within a foreseeable period, the withdrawal of the permit must be explicitly considered.
5. Insufficient reduction
In the Brabant case, the Department finds that the evidence is insufficient to show that the measures (such as the buyout of peak polluters) actually lead to the necessary reduction in nitrogen deposition in the Natura 2000 area “Kempenland-West”.
In the Gelderse case, the evidence was initially also insufficient. After additional research and the evidence with AERIUS Monitor and the Nature Objectives analyses, it was still established that there would no longer be nitrogen overload in the relevant part of the Natura 2000 area Rijntakken.
6. Follow-up
The decisions have been annulled because the GS board failed to comply with the obligation to state reasons under Article 5.4, second paragraph, of the Wnb (old law), read in conjunction with Article 6, second paragraph, of the Habitat Directive and the transitional provisions of the Environmental Act.
For each Natura 2000 site, it must be specified in concrete and substantiated terms how, through appropriate measures, the necessary reduction in nitrogen deposition will be achieved within a foreseeable period of time.
In the Brabant case, the decision regarding the Foundation Brabantse Milieufederatie’s objection must be made again by December 1, 2025 at the latest. In that decision, it must still be sufficiently substantiated that there is a necessary reduction in nitrogen deposition within a foreseeable period of time.
Do you have questions about a nature permit or regarding an application for withdrawal of a permit? Please feel free to contact us.