Schenkeveld Advocaten - High-rise buildings

Are you involved in a project where high-rise construction is taking place? In this blog I will discuss the sentence of yesterday's section on Buiksloterham 8th review. I discuss which standard for wind noise is applied to high-rise buildings, and whether moving the investigation of wind noise to the environmental permit is acceptable.

Buiksloterham

On June 7th last year, the Department sentence Regarding the “Buiksloterham 8th revision” zoning plan. This plan makes it possible to build housing on plot 19 in Buiksloterham, which has been vacant for years.

Living and living environment

Several appellants have taken up the case against the council decision, including the Loft4You VvE. They are interested parties as a group because their plot 20F borders on plot 19, which is the subject of the development.

The professional grounds relate to the (fearsome) deterioration of the living and working environment, and the consequences of the plan for their homes. Interestingly, the professional ground regarding wind noise is successful.

Wind interference

The board has policy leeway in assessing which wind noise can be considered acceptable in a spatial context. For the answer to the question of which wind noise is acceptable, Further investigation required.

Increase of high-rise buildings

High-rise construction is increasingly being used to provide new housing. This will lead to an increase in the demand for number of cases In which wind interference plays a role, it is expected to increase.

Assessment of wind noise: NEN standard

The assessment of wind noise is carried out in accordance with NEN standard 8100. Justice This means that in the case of developments exceeding 30 meters in height, wind resistance is checked against this standard. This is No legal standard.

Passing on to the permit

It does not seem possible to make the planning permission conditional on a later assessment of the wind effects.

The Department state For the time being, the plan does not stipulate that the permit for high-rise buildings will only be granted if a wind resistance study demonstrates an acceptable wind climate.

Buiksloterham

Back to the verdict on the 8th revision of Buiksloterham. According to the Department, the council has not sufficiently ensured that there will be no unacceptable consequences for the residents in the planning permission. For example, it does not stipulate that the environmental permit will be refused if research shows that the wind noise is unacceptable. Nor does it stipulate when there is unacceptable noise. This does not provide sufficient certainty that the permit will be refused in the event of such noise.

Wind noise study submitted to environmental permit

The ruling indicates that the postponement of the wind noise assessment to the environmental permit to be granted is insufficient. This should be regulated in the plan. Thus, if the assessment results in unacceptable consequences, the environmental permit should be refused. Another possibility is the inclusion of a conditional obligation in the plan.

Further research into wind noise

Because in this case no wind-noise study was carried out at all, and building with a height of 20 and 40 meters has been made possible, the Department believes that Loft4You’s appeal is successful. The council must make a new decision within 12 weeks regarding the Department. It remains to be seen what the final ruling will be, and whether another wind will have blown in Buiksloterham by then.

Any questions?

Are you dealing with high-rise buildings and have questions about them? Then contact Contact with us.

More blogs