{"id":60708,"date":"2023-03-01T10:09:34","date_gmt":"2023-03-01T09:09:34","guid":{"rendered":"https:\/\/www.schenkeveldadvocaten.nl\/?p=60708"},"modified":"2023-03-01T10:09:34","modified_gmt":"2023-03-01T09:09:34","slug":"revocation-of-irrevocable-environmental-permit-for-wind-farm-is-possible","status":"publish","type":"blog","link":"https:\/\/www.schenkeveldadvocaten.nl\/en\/blog\/intrekken-onherroepelijke-omgevingsvergunning-voor-windpark-is-mogelijk\/","title":{"rendered":"Withdrawal of irrevocable environmental permit for wind farm is possible"},"content":{"rendered":"<p><img decoding=\"async\" loading=\"lazy\" class=\"size-medium wp-image-60709 aligncenter\" src=\"https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-300x169.jpg\" alt=\"Schenkeveld Advocaten - wind turbines\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-300x169.jpg 300w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-1200x675.jpg 1200w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-1536x864.jpg 1536w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-200x113.jpg 200w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-568x320.jpg 568w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-768x432.jpg 768w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines-992x558.jpg 992w, https:\/\/www.schenkeveldadvocaten.nl\/wp-content\/uploads\/2023\/03\/windturbines.jpg 1920w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>The 2019 climate agreement has formulated as a goal to reduce greenhouse gas emissions by 49% by 2030 compared to 1990. Wind on land or at sea can contribute to these goals. This can be done, for example, by permitting a wind farm with a planning and environmental permit. It is important to follow European regulations carefully in this regard. This is evident from a recent ruling of the European Court of Justice. <a href=\"https:\/\/deeplink.rechtspraak.nl\/uitspraak?id=ECLI:NL:RBMNE:2023:627\" target=\"_blank\" rel=\"noopener\">Midden-Nederland Court<\/a>.<\/p>\n<h2>Environmental permit for the Dronten wind farm<\/h2>\n<p>For a wind farm in the municipality of Dronten, <a href=\"https:\/\/www.ruimtelijkeplannen.nl\/documents\/NL.IMRO.0000.EZKIP18WPBLAUW-3002\/r_NL.IMRO.0000.EZKIP18WPBLAUW-3002.html\" target=\"_blank\" rel=\"noopener\">Windplan Blue<\/a>, A national adaptation plan has been established and, in addition, an environmental permit has been granted for the operation of wind turbines. The plan and the environmental permit have been in effect since a <a href=\"https:\/\/deeplink.rechtspraak.nl\/uitspraak?id=ECLI:NL:RVS:2019:3760\" target=\"_blank\" rel=\"noopener\">sentence<\/a> from the Council of State dated November 6, 2019, irrevocable. The wind turbines are ready to be put into operation in April 2023. According to an interest group, the environmental permit was granted in violation of European law. They request the Dronten council to revoke the environmental permit.<\/p>\n<h2>Environmental assessment required<\/h2>\n<p>Based on the EU SMB directive, plans and programs concerning spatial planning constitute a future framework for granting permits; an environmental assessment is required. The rules for the operation of wind turbines are included in <a href=\"https:\/\/wetten.overheid.nl\/jci1.3:c:BWBR0022762&amp;hoofdstuk=3&amp;afdeling=3.2&amp;paragraaf=3.2.3&amp;z=2022-09-21&amp;g=2022-09-21\" target=\"_blank\" rel=\"noopener\">Paragraph 3.2.3 of the Environmental Management Activity Decision<\/a>. In a <a href=\"https:\/\/deeplink.rechtspraak.nl\/uitspraak?id=ECLI:NL:RVS:2021:1395\" target=\"_blank\" rel=\"noopener\">2021 verdict<\/a> Has the Council of State ruled that the rules in the Activities Decision constitute a plan or program within the meaning of the SMB Directive? No environmental assessment has been carried out for those rules, although that was required. To temporarily rectify this shortcoming, a <a href=\"https:\/\/zoek.officielebekendmakingen.nl\/stb-2022-181.html\" target=\"_blank\" rel=\"noopener\">Temporary bridging arrangement<\/a>, until the required environmental assessment has been carried out.<\/p>\n<h2>Withdrawal of environmental permit<\/h2>\n<p>Back to the case. The court refers to the 2020 Nevele judgment of the EU Court of Justice. According to that judgment, failure to comply with the procedural rules of the SMB directive can lead to the revocation of the environmental permit. The court does not do so in this case, because the expectation is that the environmental assessment will be carried out at the beginning of 2024 and the wind turbines will only be put into operation in 2023. According to the court, that is an acceptable period. The environmental permit therefore remains in effect.<\/p>\n<p>The court does issue a warning. If the environmental assessment and the new regulations regarding wind turbines take longer to be finalized, the environmental permit may have to be revoked.<\/p>\n<h2>Need advice or assistance?<\/h2>\n<p>If you have any questions about this ruling or if you have any questions about an environmental permit, please contact:\u00a0<a href=\"https:\/\/www.schenkeveldadvocaten.nl\/en\/contact\/\">Contact<\/a>\u00a0contact one of our specialists\u00a0<a href=\"https:\/\/www.schenkeveldadvocaten.nl\/en\/rechtsgebieden\/public-law\/\">public law<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>The 2019 climate agreement formulated a goal of reducing greenhouse gas emissions by 49% by 2030 compared to 1990. Wind on land or at sea can contribute to these goals. This can be done, for example, by permitting a wind farm with a planning and environmental permit. It is important to follow European regulations in this regard. This is evident from a recent ruling by the Midden-Nederland court.<\/p>","protected":false},"featured_media":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categorie_blog":[23],"class_list":["post-60708","blog","type-blog","status-publish","hentry","categorie_blog-overheidsrecht"],"acf":{"auteur":null},"mb":[],"mfb_acf":{"auteur":{"simple_value_formatted":"","value_formatted":null,"value":null,"field":{"ID":1100,"key":"field_69a178848abe5","label":"Auteur","name":"auteur","aria-label":"","prefix":"acf","type":"post_object","value":null,"menu_order":0,"instructions":"","required":0,"id":"","class":"","conditional_logic":0,"parent":1099,"wrapper":{"width":"","class":"","id":""},"post_type":["mensen"],"post_status":["publish"],"taxonomy":"","return_format":"id","multiple":0,"allow_null":0,"allow_in_bindings":0,"bidirectional":0,"ui":1,"bidirectional_target":[],"_name":"auteur","_valid":1}}},"mfb_rest_fields":["title"],"_links":{"self":[{"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/blog\/60708","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/types\/blog"}],"version-history":[{"count":0,"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/blog\/60708\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/media?parent=60708"}],"wp:term":[{"taxonomy":"categorie_blog","embeddable":true,"href":"https:\/\/www.schenkeveldadvocaten.nl\/en\/wp-json\/wp\/v2\/categorie_blog?post=60708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}